Rack-Mounting The Router Chassis - Cisco ASR 9000 Series Installation Manual

Aggregation services router hardware
Hide thumbs Also See for ASR 9000 Series:
Table of Contents

Advertisement

Rack-Mounting the Router Chassis

Figure 109: Removing a Line Card from the Cisco ASR 9912 Router Top Card Cage
1
Loosen the captive
screws.
Step 4
Repeat Step 2 or Step 3 for each FC, LC, and RP card.
Rack-Mounting the Router Chassis
The router chassis is installed in a front-mounted position, as shown in the
In a front-mounted position, the chassis rack-mounting flanges are secured directly to the rack posts.
Note
The Cisco ASR 9922 Router and Cisco ASR 9912 Router are designed to mount in only 4-post racks.
Cisco ASR 9000 Series Aggregation Services Router Hardware Installation Guide
102
2
Pivot the ejector
levers outward to
unseat the card from
the backplane
connector.
Unpacking and Installing the Chassis
3
Slide the card out of
the chassis.
Telco 2-Post Rack
section.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents