USSC Clayton 1800GC Installation & Operator's Manual page 9

Wood and coal furnace
Table of Contents

Advertisement

BAFFLE
BAFFLE
ROD
EXTENSION
SHAKER GRATE HANDLE INSTALLATION
SHAKER GRATE HANDLE INSTALLATION
SHAKER GRATE HANDLE INSTALLATION
SHAKER GRATE HANDLE INSTALLATION
SHAKER GRATE HANDLE INSTALLATION
1. Attach angle with two 1/4" x 3/4" hex bolts and two 1/4"
lock nuts.
2. Attach handle with 1/4" x 1" hex bolt and 1/4" lock nut.
3. Put brass knob onto end of handle.
1 1 1 1 1
2 2 2 2 2
3 3 3 3 3
ATTACHING SLIDE BAFFLE ROD EXTENSION
ATTACHING SLIDE BAFFLE ROD EXTENSION
ATTACHING SLIDE BAFFLE ROD EXTENSION
ATTACHING SLIDE BAFFLE ROD EXTENSION
ATTACHING SLIDE BAFFLE ROD EXTENSION
ROD
1-1/2"
HEX COUPLING
THE MODELS 1600 AND 1800 HAVE BEEN
THE MODELS 1600 AND 1800 HAVE BEEN
THE MODELS 1600 AND 1800 HAVE BEEN
THE MODELS 1600 AND 1800 HAVE BEEN
THE MODELS 1600 AND 1800 HAVE BEEN
EQUIPPED WITH DIFFERENT PLENUM
EQUIPPED WITH DIFFERENT PLENUM
EQUIPPED WITH DIFFERENT PLENUM
EQUIPPED WITH DIFFERENT PLENUM
EQUIPPED WITH DIFFERENT PLENUM
OPENINGS, THEY ARE AS FOLLOWS:
OPENINGS, THEY ARE AS FOLLOWS:
OPENINGS, THEY ARE AS FOLLOWS:
OPENINGS, THEY ARE AS FOLLOWS:
OPENINGS, THEY ARE AS FOLLOWS:
MODEL 1600
MODEL 1600
MODEL 1600
MODEL 1600
MODEL 1600
13"x18" Rectangle Plenum Opening
MODEL 1800
MODEL 1800
MODEL 1800
MODEL 1800
MODEL 1800
18"x18" Sqaure Plenum Opening
SMOKE DOOR INSTALLATION
SMOKE DOOR INSTALLATION
SMOKE DOOR INSTALLATION
SMOKE DOOR INSTALLATION
SMOKE DOOR INSTALLATION
1/4" X 1-1/4"
CARRIAGE BOLTS
FRONT
OF
FURNACE
FUEL
LOADING
DOOR
FRAME
9
SMOKE DOOR CLIPS
SMOKE DOOR
1/4" LOCK
NUTS

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clayton 1600gc

Table of Contents