Wiring Instructions - USSC Clayton 1600 Installation & Operator's Manual

United state stove co. the wood and coal furnace installation/operator's manual 1600, 1800
Table of Contents

Advertisement

ONCE ALL CONNECTIONS
HAVE BEEN MADE,
REPLACE BOX COVER
AND SECURE WITH (4)
- 8 X 1/2" TEK SCREWS.
TO THERMOSTAT
CAUTION
USE NO MORE
THAN A 10 AMP
FAST-BLO FUSE

WIRING INSTRUCTIONS

ELECTRONIC CONTROL CENTER
All electrical wiring should be performed by a qualified electrician.
AC
A/C
OPTIONAL
TO 110 VAC POWER
PLUG IN CONNECTION
FROM DRAFT RECEPTACLE.
24V
OPTIONAL
PLUG IN CONNECTOR FROM
DISTRIBUTION BLOWER
FUSE
BOX
NOTE: DAMAGE TO HEAT SENSOR WILL PREVENT
UNIT FROM OPERATING PROPERLY.
HEAT SENSOR
DRAFT
RECEPTACLE
CONTROL CENTER
20
PLUG IN CONNECTION
FROM HEAT SENSOR.
(SMALL BLACK PLUG.)
MATCH COLOR OF
WIRES AND JOIN
WITH WIRE NUTS.
RED
BLACK
WHITE
BLUE
1988
CIRCUIT
BOARD
THERMOSTAT
BLUE
BLACK
WHITE
RED
1987
CIRCUIT
BOARD
BLOWER

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clayton 1800

Table of Contents