Filter Boxes - USSC Clayton 1600 Installation & Operator's Manual

United state stove co. the wood and coal furnace installation/operator's manual 1600, 1800
Table of Contents

Advertisement

DELUXE FILTER BOX
Model 1600 / 1800 (see service bulletin #2)
16" x 20" x 1" Filter Required
2. Position top so 2" wide lip is
turned toward furnace. Place
top over sides and secure
with (4) sheet metal screws
per side.
3. Center assembly from left to right on back of furnace with
bottom of filter box resting on edge of furnace bottom.
NOTE: DO NOT PLACE A SCREW IN THE MIDDLE HOLE
KIT #C61999
1. Attach sides
of filter box to
bottom with
(4) sheet metal
screws per
side.
Be sure sides
are inside
bottom lips
and positioned
with predrilled
holes as
illustrated.
Side with no
lip
faces
back of
furnace.
2" Lip
Be sure filter
box is perfectly
square. Mark
position of screw
holes on back of
furnace. Drill
starter holes and
secure assembly
to back of furnace
with self-tapping
screws.
OF EITHER SIDE AT THIS POINT.
4. Attach filter holders to sides of enclosure with sheet metal
screws.
5. Position filter filler
between side filter
holders and secure
to back of furnace
with two self-tapping
screws.
7. Attach handle to filter
cover and slide into
position.
8. Connect cold air return
duct to top flange of
NOTE: Drill, punch, or
cut access holes as
necessary for entrance
of power cables,
thermostat wire and
domestic hot water coil
27
16" x 20" opening
6. Attach blower access
cover to enclosure with
sheet metal screws.
Insert filter (not supplied).
filter box.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clayton 1800

Table of Contents