IBM Rear Door Heat eXchanger V2 Installation And Maintenance Manual page 48

Table of Contents

Advertisement

18. Using the lift handles and the required three people, tilt and hold the heat
Figure 25. Installing the heat exchanger door
19. While two people hold the heat exchanger steady, have a third person climb
20. Align the two open holes in the top of the rack with the threaded holes in the
21. Secure the top hinge bracket to the rack with two screws. Do not fully tighten
22. Open and close the door one or two times to be sure that it aligns correctly,
38
Rear Door Heat eXchanger V2: Installation and Maintenance Guide
exchanger close to the rear door opening and align the hole in the bottom of
the heat exchanger with the hinge pin on the bottom hinge bracket. You might
have to move the heat exchanger around until the pin slides into the hole in
the bottom of the heat exchanger.
Note: There are two holes on the bottom hinge side of the heat exchanger.
Make sure that the hinge pin goes into the hole that is closest to the
rear of the heat exchanger.
Screws
Top hinge
bracket
Bottom hinge
pin
the platform ladder, rotate the top hinge bracket, and position the top hinge
bracket pin in the hole on the top of the heat exchanger.
top hinge bracket and square up the heat exchanger with the rack.
the screws.
adjusting the bracket as needed. Then, tighten all three screws.
Note: Use a torque screwdriver to tighten the screws to 10±1 Nm.

Advertisement

Table of Contents
loading

This manual is also suitable for:

1756

Table of Contents