In cases where there are large amounts of slack LAN cables after installation:
Keep cables away from the power conversion circuits and conductors
in order to avoid interference in the parallel control communication.
Do not roll cables as doing so may cause signal interference.
PROHIBIT
Example of 1000kVA
(Door of bypass cabinet)
UPJR-D*
Main control board
Figure 4-4: Example of the Inside of Bypass Cabinet after Installation (1000kVA)
G9000 MMS KIT Installation Manual 1000-2000kVA – 200150-001
IMPORTANT NOTICE
Ground Bus
IFAU-16*
Parallel interface board
CSAU-07*
Sensor board
(Behind this panel)
IFAU-16*
9