READ SECTION 6 ENTITLED BATH USE before placing the bath
in service.
Incorrect handling can damage the bath and void the warranty. This section gives
a brief summary of the steps required to set up and operate the 7008 bath. This
should be used as a general overview and reference and not as a substitute for
the remainder of the manual. Please read Section 5 through 8 carefully before
operating the bath.
4.1 Unpacking
Unpack the bath carefully and inspect it for any damage that may have occurred
during shipment. If there is shipping damage, notify the carrier immediately.
Verify that all components are present:
•
7008 bath
•
Access cover
•
Thermometer/fill hole cover
•
Drain valve with brass elbow
•
Controller probe
•
Report of test
•
User's guide
•
Resistor rack
If you are missing any item, please contact an Authorized Service Center for
assistance. See Section1.3 for Service Center contact information.
4.2 Set Up
Set up of the bath requires careful unpacking and placement of the bath, filling
the bath with fluid, installing the probe and connecting power. Consult Section5
for detailed instructions for proper installation of the bath. Be sure to place the
bath in a safe, clean and level location.
CAUTION:
Chapter 4
Quick Start
4-1