Adjusting / Position Of The Icebank Probe; Installation Check List - Cornelius Triton Series Manual Operation

Undercounter cooler
Table of Contents

Advertisement

11 Adjusting / Position of the Icebank Probe

(To be done only by « operator »)

12 Installation Check List

You can use this check list to review the installation of the device. Fill out the check list and keep it with the
operating instructions.
Part number of the device:
Serial number of the device:
Installation site:
Installation date:
Installed by:
Settings:
Water flow pressure:
CO
-pressure:
2
CO
-volume at 4°C:
2
Carbonator filling time:
CO
-pressure switch
2
Stillwater pressure switch
stillwatercontrol
Cornelius Deutschland GmbH
Document no: TD1014600EN
Version A, 24.09.2019, Index 0
__________________
__________________
__________________
__________________
__________________
Target
0.2 MPa (2 bar, dynamic)
0.52 to 0.58 MPa (5.2 to 5.8 bar)
4.0% by vol.
about 8 sec
0.3 MPa (3 bar)
0.32 MPa (3.2 bar)
0.42 MPa (4.2 bar)
Triton R134a Range
Actual
____ MPa
____ MPa
____ % by vol.
____ sec
____ MPa
____ MPa switch
____ MPa
Manual operation undercounter cooler
Triton R134a Range
Page 25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents