Cisco ASR 914 Manual page 62

Hide thumbs Also See for ASR 914:
Table of Contents

Advertisement

Set up 3G Patch Panel on Rack
Figure 40: Installing the Patch Panel - Dual in a 23-inch Rack
Step 5
Secure the brackets to the chassis with the screws. The recommended maximum torque is 28 in.-lb (3.16
N-m).
• EIA 19 and 23 inches mounting brackets for both single and double 3G interface module patch panels.
• ETSI 21 inches mounting brackets for both single and double 3G interface module patch panels.
Set up 3G Patch Panel on Rack
To install the optional cable management brackets, perform these steps:
Procedure
Step 1
Position the cable management brackets against the front of the chassis and align the screw holes, as shown
in the figure.
Step 2
Secure the cable management brackets with the screws. The recommended maximum torque is 10 in.-lb (1.12
N-m).
Installing the Cisco ASR 914 Router
62
Installing the Cisco ASR 914 Router

Advertisement

Table of Contents
loading

Table of Contents