Installing Patch Panel
Figure 30: Patch Panel Rear View with Brackets and Guides
Step 5
Secure the guides to the brackets with the screws. The recommended maximum torque is 28 in.-lb (3.16 N-m).
Step 6
Position the patch panel with brackets and guide onto the rack and secure with screws provided. The
recommended maximum torque is 28 in.-lb (3.16 N-m), see the figure below.
Installing the Cisco ASR 914 Router
52
Installing the Cisco ASR 914 Router