Appendix
A.4 Acceptance test/configuration test
Logging the settings
File name of the log:
...
...
Data backup
Data
Log of the settings
Acceptance tests
STARTER traces
PLC program
Circuit diagrams
Enter the safety relay setting:
● Setting of the DIP switch and where relevant the rotary switch with the time.
● Documentation of the parameters for a parameterizable safety relay, e.g. a 3SK2...
● Logging the parameters for OFF2 when using SS1-t.
Countersignatures
Commissioning engineer
This confirms that the tests and checks have been carried out properly.
Date
...
...
Machine manufacturer
This confirms that the settings documented above are correct.
Date
...
...
140
Archive type
...
...
...
...
...
Name
Name
Storage medium
Designation
...
...
...
...
...
Company/dept.
...
Company/dept.
...
Hardware Installation Manual, 12/2018, A5E32844552B AF
Archive location
Date
...
...
...
...
...
...
...
...
...
...
Signature
...
Signature
...
Power Module PM330