Unpacking; Removing The Packaging; Figure 4-6 Transporting A Transportation Unit (Still In Packaging) With A Crane - Siemens SINAMICS SL150 6SL39616RC100AA02 Operating Instructions & Installation Instructions

Medium-voltage
Table of Contents

Advertisement

3. Pay attention to the center of gravity imprinted on the box
4. Carefully raise the transportation unit.
4.5

Unpacking

4.5.1

Removing the packaging

NOTICE
Incorrect storage of unpacked devices
Proper packaging ensures that the equipment is protected. Unpackaged equipment may be
damaged if it is stored or out of service over a long period.
Carefully observe the instructions for storage in Chapters "Storage" and "Technical data and
drawings". Remove the packaging immediately prior to installation.
The units are packed by the manufacturers in accordance with the order.
SINAMICS SL150 6SL39616RC100AA02
Operating Instructions Rev.201910281458 EXAMPLE
the ropes
.
Spreader beam
Center of gravity
Imprinted position of the rope
Figure 4-6
Transporting a transportation unit (still in packaging) with a crane
Preparations for use
4.5 Unpacking
and the imprinted position of
49

Advertisement

Table of Contents
loading

Table of Contents