Fc Configurations For 2-Pipe Systems - Carrier ComfortVu TBPL-24-H Installation And Operation Manual

Bacnet thermostat standard tb-hm line voltage
Hide thumbs Also See for ComfortVu TBPL-24-H:
Table of Contents

Advertisement

FC configurations for 2-pipe systems

Find the configuration you want in the tables below, then find that configuration number (20 through 23) on Wiring and DIP
switch/jumper settings (page 33).
FC Configurations for 2-Pipe systems
Outputs
Configuration
Cl/Ht valve / Cl/Ht valve PID
Heat element (2nd stage)
Fan VFS
Fan speeds
Economizer
Humidifier
Dehumidifier
Reheat (Dehumidify)
FC Configurations for 2-Pipe systems
Outputs
Configuration
Cl/Ht valve / Cl/Ht valve PID
Heat element (2nd stage)
Fan VFS
Fan Speeds
Economizer
Humidifier
Dehumidifier
Reheat (Dehumidify)
• Yes
○ Option
ComfortVu™ BACnet Thermostat Model Standard TB-HM (Line voltage)Carrier Proprietary and Confidential CARRIER CORPORATION ©2020
Installation and Operation Guide
humidification/dehumidification
without
20
21
PID
1 2 3 1 2 3
○ ○
humidification/dehumidification
with
24
25
PID
1 2 3 1 2 3
○ ○
○ ○
22
23
PID
26
27
28
PID
1 2 3 1 2 3
○ ○
26
29
30
PID
○ ○
○ ○
All rights reserved

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Comfortvu standard tb-hm

Table of Contents