Data Backup In A Step 7 Project - Siemens SINAMICS S120 Faq

About drive technology
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

SINAMICS S120 at Technology CPU Entry ID: 21767896
Figure 4-4 Permanent storing of the loaded data – Copy RAM to ROM
4.3.2

Data backup in a STEP 7 project

All parameters and BICO interconnections can also be backed up and
archived in a STEP 7 project. This requires that the data are loaded from
SINAMICS S120 to the STEP 7 project.
Backing up the data
To back up the data, proceed as follows:
Table 4-3 Backup of the drive data
No.
1.
V1.0
Instruction
Edition 10/28/05
Requirements
Data Backup of SINAMICS S120
Note
In the Project menu, establish the
online connection to SINAMICS
S120 by selecting the menu item
Connect to target system.
29/58

Advertisement

Table of Contents
loading

Table of Contents