Download Print this page

Toro 140-1914 Installation Instructions Manual page 6

48in, 54in, or 60in recycler kit proline commercial walk-behind mower with floating cutting unit

Advertisement

5
Installing the Kicker Baffles
48-Inch Decks Only
Parts needed for this procedure:
2
Kicker baffle
4
Hex-washer-head bolt (5/16 x 3/4 inch)
Procedure
Install the kicker baffles to the underside of the deck
using 4 bolts (5/16 x 3/4 inch) at the locations shown
in
Figure
13.
Figure 13
1. Kicker baffle
g012843
2. Bolt (5/16 x 3/4 inch)
6
Installing the Left Baffle
Parts needed for this procedure:
1
Left baffle
Carriage bolt (5/16 x 3/4 inch)—48-inch, 54-inch, and
1
60-inch decks
3
Nut (5/16 inch)—48-inch decks only
4
Nut (5/16 inch)—54-inch and 60-inch decks only
Procedure
1.
Install the left baffle as follows:
For 48-inch decks, install the left baffle
using 3 nuts (5/16 inch) and 1 carriage bolt
(5/16 x 3/4 inch) as shown in
1. Nut (5/16 inch)
2. Carriage bolt (5/16 x 3/4
inch)
For 54-inch and 60-inch decks, remove the
existing fasteners from the holes shown in
Figure
15, and install the left baffle using 4
nuts (5/16 inch) and 1 carriage bolt (5/16 x
3/4 inch).
6
Figure
Figure 14
3. Left baffle
14.
g012841

Advertisement

loading

This manual is also suitable for:

140-1915140-1916