Download Print this page

Toro 140-1914 Installation Instructions Manual page 4

48in, 54in, or 60in recycler kit proline commercial walk-behind mower with floating cutting unit

Advertisement

1. Nut (5/16 inch)
4.
Tighten all fasteners.
60-Inch Decks
1.
Remove the nut and bolt from the location
shown in
Figure 7
1. Nut and bolt
2.
Install the right baffle using 3 nuts (5/16 inch)
as shown in
Figure
hand.
Figure 6
2. Carriage bolt (5/16 x 3/4
inch)
or
Figure
8.
Figure 7
8. Tighten the fasteners by
g308757
1. Nut—5/16 inch (3)
2. Right baffle
3.
Tighten the fasteners by hand.
4
Installing the Discharge
Chute Cover
Parts needed for this procedure:
g219304
1
Discharge chute cover
3
Bolt (3/8 x 1 inch)—48-inch decks only
2
Bolt (3/8 x 1 inch)—54-inch and 60-inch decks only
3
Nut (3/8 inch)—48-inch and 54-inch decks only
2
Nut (3/8 inch)—60-inch decks only
1
Nut (5/16 inch)—60-in decks only
1
Bolt (3/8 x 1-1/4 inches)—54-inch decks only
1
Bolt (5/16 x 1-1/4 inches)—60-inch decks only
4
Figure 8
3. Welded post (3)
g219326

Advertisement

loading

This manual is also suitable for:

140-1915140-1916