Download Print this page

Toro 140-1914 Installation Instructions Manual page 5

48in, 54in, or 60in recycler kit proline commercial walk-behind mower with floating cutting unit

Advertisement

Procedure
48-inch Decks
Install the discharge chute cover using 3 bolts (3/8
x 1 inch) and 3 nuts (3/8 inch) as shown in
and
Figure
10.
1. Bolts (3/8 x 1 inch)
2. Discharge chute cover
Figure 10
1. Nuts (3/8 inch)
Figure 9
Figure 9
3. Nuts (3/8 inch)
2. Bolts (3/8 x 1 inch)
54-inch Decks
Install the discharge chute cover using 1 bolt (3/8 x
1-1/4 inches), 2 bolts (3/8 x 1 inch) and 3 nuts (3/8
inch) as shown in
g308754
1. Bolt (3/8 x 1-1/4 inches)
2. Nuts (3/8 inch)
60-inch Decks
Install the discharge chute cover using 1 carriage bolt
(5/16 x 1-1/4 inches), 1 nut (5/16 inch), 2 bolts (3/8 x 1
inch), and 2 nuts (3/8 inch) as shown in
g308755
1. Nut (5/16 inch)
2. Carriage bolt (5/16 x 1-1/4
inches)
5
Figure
11.
Figure 11
3. Bolts (3/8 x 1 inch)
Figure
Figure 12
3. Bolt (3/8 x 1 inch)
4. Nut (3/8 inch)
g307460
12.
g308758

Advertisement

loading

This manual is also suitable for:

140-1915140-1916