Section 5 Commissioning; Preparation; Preparation – Power Off - York eco YCAS Series Manual

Optimized r-407c air-cooled liquid chiller
Table of Contents

Advertisement

PREPARATION

Commissioning of this unit should
only be carried out by YORK Autho-
rized personnel.
The eco
Microcomputer Control System Operat-
2
ing Instructions must be read in conjunction with
this section.

PREPARATION – POWER OFF

Inspection
Refrigerant Charge
Valves
Compressor Oil
SECTION 5 – COMMISSIONING
Fans
Isolation/Protection
Control Panel
Power Connections
Grounding
Overloads
Supply Voltage
Control Transformer
5
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents