Installation; Unpacking The Machine; Anchoring And Handling The Machine; Electrical Connections - Jet J-FK350-2 Operating Instructions And Parts Manual

Ferrous manual cold saws
Hide thumbs Also See for J-FK350-2:
Table of Contents

Advertisement

8.0 Installation

8.1 Unpacking the machine

Do not handle the packed
machine using slings.
To install the machine, first remove the packing,
paying particular attention not to cut any electric
wires or hydraulic hoses. Lift using straps (Figure
3).
Figure 3
8.2 Anchoring and handling the
machine
The base of the machine must be anchored to the
floor by two lag bolts or studs properly anchored
into concrete.

9.0 Electrical Connections

All
must be done by a qualified
electrician. All adjustments or repairs must be
done with the machine disconnected from the
power source, unplugged. Failure to comply
may result in serious injury!
The J-FK350-2 is rated at 220V.
The J-FK350-4 is rated at 440V.
These machines not supplied with a plug. Use a
plug and outlet rated at least 20amps. The circuit
for the machine should also be protected by at
least a 20 amp circuit breaker or fuse.
Make sure that the blade turns in the correct
direction. If it does not, simply reverse two of the
phase wires on the supply input.
The cold saw is now ready for use.
electrical
connections

10.0 Controls

10.1 Control Panel

The Control Panel (Figure 4) is located on the front
of the cabinet stand and consists of the Power and
High/Stop/Low switches, described below.
Power Switch – The Power switch has two
positions, Off and On.
High/Stop/Low Switch – This switch controls the
blade speed. To operate the saw, the power switch
must set to on, High or Low must be selected, and
the Run Trigger pressed.

10.2 Trigger Handle

To operate, the Power switch must be set to ON, a
Hi or Low speed selection made, and the trigger
handle pressed.
8
Figure 4
Figure 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

J-fk350-4

Table of Contents