Daily Maintenance Schedule - Powermate Aluminum LE Series Operating Manual

Table of Contents

Advertisement

DAILY MAINTENANCE SCHEDULE

NOTE: If attempting any service repair work disconnect the battery by
depressing the toggle on the circuit breaker.
 Inspect unit frame for structural damage.
 
 Inspect wheels and tires. Grease the wheels if required. Ensure the
cotter pins are in place.
 Inspect all bolts and fasteners are in place and secure.
 Inspect the load straps for damage. Nicks or tears are not acceptable.
 Inspect the push button switches and rocker switch for condition and
operation. Make sure the wiring is secure.
 Test the circuit breaker for operation. Cycle the unit testing for
operation, direction and smoothness.
 Observe the roller operation in the outer frame rails. Oil rollers as
required. Inspect the drive screws and ballnuts for damage, bending
during operation, and lubrication.
 Ensure the operation manual is readily available for reference.
Keep the battery fully charged.
FOR PARTS AND SERVICE CONTACT:
1-800-697-Mate
 
 
8.05
®
PowerMate
Operation Manual
 
 
PN 013820 Rev.D2
Eng. 12/ 12/ 12

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Powermate Aluminum LE Series

This manual is also suitable for:

Aluminum le-2Aluminum le-1

Table of Contents