Siemens ADVIA 2400 Maintenance Procedures page 40

Chemistry system
Hide thumbs Also See for ADVIA 2400:
Table of Contents

Advertisement

6. Replace and tighten the cap.
7. At the ISE Operation window, select
The message "Line Wash 1 Running" and the approximate amount of time remaining
displays. You cannot stop this operation. If you must stop, press the
button on the analyzer display panel.
This step takes about 17 minutes.
8. When step 1 of the wash completes, replace the dummy electrode with the original
Na, K, Cl, and Ref electrodes.
9. At the ISE Operation window, in the ISE line wash area, select
The wash starts and buffer prime is performed 10 times. The message "Line Wash 2
Running" and the approximate amount of time remaining displays.
10. Verify no leaks or bubbles exist and that the buffer is going to the waste during the
priming cycle.
11. At the ISE Operation window, next to the Initialize button, select
12. Perform calibration and run controls.
144
.
Execute (STEP-1)
ADVIA 2400 Operator's Guide
SYSTEM STOP
Execute (STEP-2)
Execute
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents