KVH Industries TracVision R5 Installation Manual page 33

Hide thumbs Also See for TracVision R5:
Table of Contents

Advertisement

Appendix E
5. Thread a second tie-wrap through the forward
tie-wrap holes and over the LNB bracket. Fasten
the tie-wrap, ensuring the LNB bracket is secured
to the baseplate. Be sure to fasten the tie-wrap to the
LNB bracket, and not the LNB.
6. Reinstall the radome.
7. Place the entire antenna unit into its shipping box
using the original packaging material. Secure the
box to a pallet to ensure upright transport.
The repacking process is complete! The TracVision R5/R4 is now
ready for reshipment.
54-0359 Rev. A
Reshipping Instructions
Ensure that the tie-wrap is fastened
to the LNB bracket, and not the LNB.
If you need to return the antenna, be
sure to obtain an RMA number from
KVH's Technical Support
Department first. Be sure to write the
number clearly on the outside of the
box. Shipments received without an
RMA number will be returned to you
at your expense.
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tracvision r4

Table of Contents