Matters To Be Memorized - Toshiba R410A Service Manual

Toshiba air conditioner user manual
Hide thumbs Also See for R410A:
Table of Contents

Advertisement

12. Matters to be memorized

1. Power failure
When a power failure occurred and the power supply
has been reset, the display of the right figure appears.
:
(A colon "
" flashes.)
• Resuming of operation
1) Turn on the power (breaker) of the air condi-
tioner.
2) Start operation by the remote controller.
3) Push
button of the program weekly timer.
PROGRAM
:
The flashing colon "
" changes to the clock
display in the normal status. In this case, the
program is memorized by the backup function.
Therefore, it is unnecessary to set the program
again.
2. Operation of program weekly timer and air conditioner
An air conditioner mounted with a program weekly timer is operated on a remote
controller and on the program weekly timer.
(Example)
1) Operation pattern in a day
SuMoTuWeTh Fr Sa
Program timer
PROGRAM1
ON/OFF setup
ERROR
PROGRAM2
Remote controller
PROGRAM3
operation
Start/Stop button
ON :
Air conditioner
operation
OFF :
2) Operation pattern in a week
SuMoTuWeTh Fr Sa
PROGRAM1
ERROR
PROGRAM2
PROGRAM3
WEEKLY TIMER
PROGRAM
DAY
SET
CANCEL
HH MM
CLEAR
CHECK
8:00
12:00
12:40
16:50
17:00
19:00
ON
OFF
ON
OFF
ON
OFF
Push Push Push Push
SuMo
TuWeTh Fr Sa
Timer operation
No timer operation
No timer operation
(No reserve)
(Reservation is canceled as holiday)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents