SELECTION OF INSTALLATION
<Obstacle also at the upper side>
1000
or more
Obstacles at both front and rear sides
Open the upper side and both right and left sides.
The height of obstacle at both front and rear side,
should be lower than the height of the outdoor unit.
<Standard installation>
1. Single unit installation
2. Serial installation of two or more units
300
or more
Serial installation at front and rear sides
Open the upper side and both right and left sides.
The height of obstacle at both front and rear sides
should be lower than the height of the outdoor unit.
<Standard installation>
1000
300
1500
or more
or more
or more
• Before installation, check strength and horizontality of
• According to the following base diagram, fix the base
<SM560AT-E>
<SM800AT-E>
Set the out margin of the anchor bolt to 15mm or less.
300
or more
• In case of draining through the drain hose, attach the
2000
200
or more
or more
8
Installation of Outdoor Unit
the base so that abnormal sound does not generate.
firmly with the anchor bolts.
(Anchor bolt, nut: M10 x 4 pairs)
90
Ø28 Drain hole
150
Drain hole
Knockout hole
following drain nipple and the waterproof rubber cap,
and use the drain hose (Inner diam.: 16mm) sold on
the market. And also seal the screws securely with
silicone material, etc. so that water does not drop
down. Some conditions may cause dewing or drip-
ping of water.
Drain nipple
600
90
115
600
150
430
Drain nipple mounting hole