Tiger JD 5083E Mounting And Operating Instructions page 88

Side flail assemblies
Hide thumbs Also See for JD 5083E:
Table of Contents

Advertisement

DAILY MAINTENANCE SCHEDULE
The following services should be performed daily or every 8 hours
of service, following the detailed maintenance instructions in the operators
manual.
______ Pump Drive Shaft: Check for end play in drive shaft / coupler and
______ Crankshaft adapter: If equipped with rubber grommets check
______ Pivot points: Inject grease until it appears at ends.
______ Hydraulic fittings: Check for leaks with paper or cardboard. Tighten
______ Knives: Inspect for missing or damaged knives, change (only
______ Belts: Check / Tighten / Replace belts as needed.
______ Main Frame / Deck: Unless otherwise specified retorque bolts
______ Hydraulic Fluid Level: Add, if required, per fluid recommendations.
______ Rear Flail Drive, Bearing
Flange and Shaft Couplers: Grease as instructed in the detailed
(if applicable)
______ Cutter Shaft and Ground Roller: Grease as instructed in the detailed
Service performed by:_______ Date:____/____/____ Hour
Meter:__________
** This page may be copied and used as part of the daily maintenance routine.
MAINTENANCE
lubricate at zerks.
conditlion, replace if missing or damaged.
fittings or replace hoses immediately.
complete sets) as needed.
according to torque specifications in this
section.
Maintenance Section
Side & Rear flail Maintenance Section 4-30
maintenance section.
maintenance section

Advertisement

Table of Contents
loading

Table of Contents