Unpacking And Inspecting The Chassis And Shipping Accessories; Job Aid - Avaya AG2330 Installation Instruction

Hide thumbs Also See for AG2330:
Table of Contents

Advertisement

Unpacking and inspecting the chassis and shipping
accessories
You must carefully unpack the chassis and verify that all accessories have shipped with it.
Procedure steps
1. Remove the chassis from the shipping container.
2. Place the chassis on antistatic material.
3. Check for damage or missing accessories.
Important:
If you detect any damage, do not install the chassis. Call the Avaya Technical Solutions
Center in your area.

Job aid

The following table lists the accessories that shipped with AG2330.
Table 7: AG2330 accessories
Accessory
Rack mounting bracket that
contains two rack mounting
brackets and 14 Phillips-
head screws
Console cable
Female DB-9 to RJ-45
connector
Power cord
Installation — Chassis

Unpacking and inspecting the chassis and shipping accessories

Description
Supports the chassis in an equipment rack.
The mounting brackets require M4x6mm Flat
Head Phillips (6). The two types of screws for
the rack mount are as follows:
• For telecom racks—12-24 x 5/8 Phillips (4)
• For cabinets—10-32 x ½ Phillips (4)
Connects a management console to the
chassis.
Used, if necessary, to connect the console
cable to a terminal or PC.
Country-specific power cord provided for AC
input. One power cord is provided for each
power supply module you ordered. The
power cord is a no-charge item that is
supplied with the chassis; however it must
appear as a separate item on your order.
Verified
August 2013
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Advanced gateway 2330

Table of Contents