Standards / Regulations

- According to DIN EN 50110-1, only qualified electricians may
carry out the installation and commissioning of the heating control
unit and connected accessories.
- Observe all regulations specified by your local power supply
utility and all VDE or local regulations.
- DIN VDE 0100 regulations regarding the installation of high
voltage systems up to 1000 V
- DIN VDE 0105-100 operation of electrical systems
- Never remove, bypass or disable safety and monitoring
equipment.
- Only operate the system in perfect technical condition.
Immediately remove / remedy any faults and damage that may
impact on safety.
- Always ensure that cold water is mixed in with hot water, when
the DHW temperature is set above 60 °C (risk of scalding).
- Regularly check the perfect function of all electrical equipment.
- Only qualified personnel may remove faults or repair damage.
- Only replace faulty components or equipment with original Wolf
spare parts.
Any damage or loss resulting from technical modifications to Wolf
NB
control units is excluded from our liability.
Observe the following information regarding the disposal of faulty
system components or the system at the end of its service life:
Dispose of all components in accordance with applicable
regulations, i.e. separate material groups correctly. The aim should
be the maximum possible amount of basic materials recycled and
the lowest possible environmental impact.
Never throw electrical or electronic scrap into the household waste,
but recycle it appropriately.
Generally, dispose of materials in the most environmentally
responsible manner according environmental, recycling and
disposal standards.