3. SDH/SONET analyzer
The required transmission rate depends on the circuit packs used. The optical
circuit pack with the lowest transmission rate determines the required transmission
rate of the analyzer. For the test setup mentioned below an STM-16/OC-48
analyzer is required because OP2G5 circuit packs are used.
4. ESD Wrist Strap.
Prerequisites
Prior to performing this task, you must have done the following:
1. Set up the 1+1 MSP/APS test (see section
setup" (p.
2. Logged in to WaveStar
"Starting the WaveStar
has been enabled during WaveStar
3. Logged in to NE-A.
Automatic line switching
Proceed as follows to test the automatic 1+1 MSP/APS line switching:
...................................................................................................................................................................................................
Start an STM-16/OC-48 signal transmission via the SDH/SONET analyzer.
1
Result:
...................................................................................................................................................................................................
In the WaveStar
2
...................................................................................................................................................................................................
3
Select the existing
left-hand side of the window and click the
...................................................................................................................................................................................................
Select the
4
...................................................................................................................................................................................................
Write down the
5
...................................................................................................................................................................................................
Remove the fiber connection between NE-A and NE-B ("Working" line).
6
....................................................................................................................................................................................................................................
365-374-179R10.0
Issue 2, June 2009
10-23)).
®
CIT as Super User (see chapter 5, section
®
CIT application" (p.
No bit errors are present.
®
CIT
System View
1+1 MSP#
(SDH) or
Protection Group
tab.
and the
Working AID
Alcatel-Lucent - Proprietary
See notice on first page
Procedure 10-10: 1+1 MSP/APS test
Procedure 10-5: "1+1 MSP/APS test
5-18)) if WaveStar
®
CIT installation.
, select
View → Protection...
1+1 APS#
(SONET) in the
button.
Select
and do not close the window.
Protection AID
Procedure 5-4:
®
CIT User Login
.
Ptn Grp
tab on the
10-55

Advertisement

Table of Contents
loading

Table of Contents