Installation Sequence 300 L Capacity; Installing Leads For The Thermometer Sensor And Temperature Controller Sensor - Viessmann Vitocell 300-B Installation Instructions Manual

Table of Contents

Advertisement

300 l capacity

Installing leads for the thermometer sensor and temperature controller sensor

6.
Fig. 4
Type plate
A
1. Remove top panel, thermal insulation, and parts for
flange cover installation.
2. Route the sensor lead of the lower thermometer
downwards through the opening in the thermal
insulation and the cable channel.
3. Push the sensor lead through the strain relief
sleeve and route to the sensor well.
4. Fit the strain relief sleeve to the sensor well.
8
1.
3.
4.
5.
8.
C
A
8.
2.
2.
5. Push the cylinder temperature sensor into the sen-
sor well as far as it will go.
Note
Never wrap insulating tape around the sensor.
6. Secure sensor lead with strain relief sleeve.
7. If a high limit safety cut-out is installed:
Cut out opening
Push high limit safety cut-out sensor
clamping bracket, and secure with wing screw.
8. Remount the flange insulation and top panel.
7.
B
on flange insulation.
A
B
into

Advertisement

Table of Contents
loading

Table of Contents