Siting information
!
Please note
To prevent material losses, install the DHW cyl-
inder in a room free from draughts and risk of
frost.
When not in use, the DHW cylinder must be
drained if there is a risk of frost.
Siting the DHW cylinder with immersion heater
a
Fig. 3
Immersion heater installation instructions
Maintain the minimum clearance.
Cylinder capacity
300 l
500 l
Note
The unheated length of any threaded immersion
heater installed on site must be at least 100 mm.
(cont.)
Dim. a
730 mm
670 mm
■
Provide adequate clearance from the wall to allow for
operation of the temperature controller (if installed).
Use the adjustable feet to level the DHW cylinder.
■
Note
Never extend the adjustable feet beyond a total
length of 35 mm.
7