Service Clearances - External; Installation Of Flashing; Sp4, Sp5 And Sp6 External Clearances - Rinnai Brivis StarPro SP623UN Installation Manual

Ducted gas heater
Table of Contents

Advertisement

Method 3: Lay-down Option – In Ceiling
Diagram 6. Method 3 Clearances
Method 4: Lay-down Option – Under Floor
Diagram 7. Method Clearances
700 mm
Note: Method 3 and Method 4 are not options for SP430 and SP435 models. These models may be installed to Method 1 or Method
2 only.
SERVICE CLEARANCES – EXTERNAL
3.4

3.4.1 Installation of Flashing

The flashing must be fitted to ensure the ductwork is adequately weather protected.
Note: To allow the heater to be moved out from the wall such as for servicing, it is important to provide additional length in the ducting
connected to the pops.

3.4.2 SP4, SP5 and SP6 External Clearances

Front: A minimum of 500mm must be provided at the side facing away from the house.
End: A minimum of 300mm must be provided at each end of the heater.
Top: A minimum of 1000mm must be provided above the heater roof. This clearance must be maintained for the
entire surface area of the heater roof.
Rinnai
Service
700 mm
Clearance
(Full length of heater)
300 mm (refer to AS5601)
750 mm
Service
Clearance
(Full length of heater)
750 mm
Fire resistant board
(refer to AS5601)
Side View
Lowest part of floor structure
200 mm (
)
refer to AS5601
Concrete Base 50mm
Side View
14
Ground
Ducted Gas Heater IM