Power Supply
5.3
Fuse Protection
Fuse protection for the on-site connection: see
Note
Due to induction the intensity of the current flowing at the moment of switch-on is a
multiple of the normal current. The magnetizing current (rush effect) of the transformer
rises considerably and may trigger the lab fuse. We recommend to use a safety circuit
breaker with slow trigger characteristics.
5.4
Grounding / Earth Connection
The Minilabmust be earthed directly and correctly.
HOHER ABLEITSTROM
Erdverbindung herstellen!
HIGH LEAKAGE CURRENT
Earth connection before
16
2005-05-01 / PN 04100_01
Vor Inbetriebnahme
connecting supply !
d-lab.2, d-lab.2plus, netlab.2plus: Preinstallation
table on previous page.