Check The Installation - Southbend Marathoner Gold ES/20SC Operator's Manual

Electric convection ovens
Hide thumbs Also See for Marathoner Gold ES/20SC:
Table of Contents

Advertisement

I
NSTALLATION
E
C
O
LECTRIC
ONVECTION
VENS
6. Attach each supply wire to the appropriate terminal of the contactor (according to the wiring diagram).
7. Insert the ground wire into the grounding lug and tighten the screw.
8. Check that all connections match the wiring diagram and are tight.
9. Reattach the right-side panel and insulation; and the lower-front panel.
Step 6: Check the Installation
1. Check that all screws and bolts are tightened.
2. Move the oven into the position at which it will be operated.
3. Check that the oven is level. If not, adjust the legs.
4. Check that the appropriate clearances are satisfied (see page 7).
5. Turn-on supply power and check oven for proper operation.
P
20
O
'
M
1181958
AGE
PERATOR
S
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents