Initial start-up
2.1.5
Adjusting the flow temperature
Open the cover to the 2nd operating level (fig. 20, item 1).
Adjust the knob (fig. 20, item 2) to the desired flow
temperature (table 6) for your particular installation.
NOTE
Factory setting of the controller is "10"
(around 83 °C).
NOTE
If the flow temperature is set too low, there is
the risc that an external hot water cylinder
cannot achieve a comfortable enough
temperature.
2.1.6
Setting the heating capacity
Set the heating capacity (table 7), according to the amount of
heat required, at the controller (fig. 20, item 4).
NOTE
The controller is factory-adjusted to position "6"
Subject to modifications resulting from technical improvements!
22
Installation and maintenance instructions for wall-mounted condensing gas boiler Buderus 600 - 11R/19R/24R • 05/2004
2
Fig. 20 Control box
Key to Fig. 20:
1: Cover for second operating level
2: Flow temperature knob
3: Heat-capacity jumper
4: Heating capacity knob
5: only used when boiler is in service mode
6: only used when boiler is in service mode
Heating capacity [kW] (±5 %)
Controller
setting
11 R
1
4.9
2
5.6
3
6.3
4
6.9
5
7.6
6
8.3
7
9.0
8
9.6
9
10.3
10
11.0
Table 7
Heating capacity
Boulter Buderus Ltd. • http://www.boulter-buderus.co.uk
3
11
KW
0
1
1
2
1
10
1
10
4
6
5
1
19 R
24 R
9.7
9.7
10.7
11.3
11.8
12.9
12.8
14.5
13.8
16.0
14.9
17.6
15.9
19.2
16.9
20.8
18.0
22.4
19.0
24.0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

600-11r600-24r600 series11r19r24r

Table of Contents