Fitting Supports For Gear­unit Swing Base; Attaching The Support; Gear Units With Cooling Coil; Gear Unit With Add­on Components - Siemens FLENDER B3 E Series Assembly And Operating Instructions Manual

Belt conveyor gear unit, sizes 4 to 28
Table of Contents

Advertisement

6.12
Fitting supports for gear­unit swing base

6.12.1 Attaching the support

The support for the gear­unit swing base must be mounted free of stress.
2
4
Fig. 55: Support for gear­unit swing bases
1
Gear unit
2
Motor
3
Gear­unit swing base
For realising the foundation for fastening the torque arm, see item 6.3.1 (Foundation).
6.13

Gear units with cooling coil

Before connecting the cooling coil the screw plugs must be removed from the connecting bushes.
Flush the cooling coil (in order to remove any contamination).
Connect the cooling­water in­ and outflow pipes (for exact position of the connections, see
dimensioned drawing).
Observe also item 5.10.2.
6.14
Gear unit with add­on components
For the technical data to the add­on components, as stated in item 6.15 to 6.22, refer to the
order­specific list of equipment.
The electrical equipment for regulation and control must be wired in accordance with
the equipment suppliers' instructions.
For operation and maintenance the operating instructions provided specifically for
the order and the specifications in item 5.10.3 to 5.17.4 must be observed.
6.15
Gear units with air oil­cooler
Wire the contamination indicator for switchover filter (for gear­unit sizes
electrically.
Connect the fan motor electrically.
1
2
5
3
4
Torque arm
5
Support block
BA 5033 EN 03/2011
69 / 96
1
3
13) and pressure monitor

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents