Garmin G1000 Airplane Flight Manual Supplement page 22

Integrated avionics system installed in mooney m20r
Hide thumbs Also See for G1000:
Table of Contents

Advertisement

AFM SUPPLEMENT
GARMIN G1000 INTEGRATED AVIONICS SYSTEM
Cabin Heat
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cabin Vent
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fuel Selector
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Landing Gear Switch
Red Emergency Gear Extension Handle
Internal Lights
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Passenger Briefing
Refer to SECTION IX -- Supplemental Data for other Optional Equip-
ment Procedures and Checks.
IFR flight should not be initiated if the operation of the standby al-
ternator and emergency bus is not in satisfactory condition prior
to take off.
BEFORE TAXI
Engine Start Checklist
Elevator Trim Switch
Internal/External Lights
PFD/MFD
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Comm/Nav Radios
Altimeter
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fuel Selector
. . . . . . .
Cabin Heat
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Defroster
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cabin Vent
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Flight Plan
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Optional Equipment Checks
TAXI
Before Taxi Checklist
Rudder Trim
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
With Rudder Trim in the full right position the aircraft will tend to
steer to the right during taxi.
22 of 33
FAA APPROVED
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-WARNING-
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Switch Tanks, verify engine runs on other tank
. . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-CAUTION-
Down Position
. . . . . . . .
Down and Latched
Check Normal Operation
Checked and Set
Reference Section IX
REVISION A 06--2005
REVISION B 03--2006
MOONEY
M20R
Push Off
As Desired
Fullest Tank
Off
Completed
Completed
On
As Desired
Set
As Desired
As Desired
As Desired
As Desired
Completed
As Desired
ISSUED 11 - 2004

Advertisement

Table of Contents
loading

Table of Contents