Trane City RTSF050 Installation Operation & Maintenance page 9

Water-cooled liquid chillers with helical rotary compressors
Hide thumbs Also See for City RTSF050:
Table of Contents

Advertisement

Installation overview and
requirements
Contractor responsibilities
Sound power levels
A list of the contractor responsibilites typically associated
with the installation process is provided in Table 2.
Discharge
• Locate and maintain the loose parts. Loose parts are
located in the control panel.
Measurement conditions:
• Install the unit on a foundation with flat support surfaces,
Measurements taken in a room adjacent to the room containing the FWD, at the outlet of the rectangular duct (1.5 m
level within 5 mm and of sufficient strength to support
long) fixed to its discharge opening.
concentrated loading. Place the manufacturer-supplied
isolation pad assemblies under the unit.
Fan
• Install the unit per the instructions outlined in the
Unit
speed
"Mechanical Installation" section.
1
FWD 08
2
• Complete all water piping and electrical connections.
3
Note: Field piping must be arranged and supported to
1
FWD 10
avoid stress on the equipment. It is strongly recommended
2
3
that the piping contractor provide at least 1m of clearance
1
between the pre-installation piping and the planned location
FWD 12
2
of the unit. This will allow for proper fit-up upon arrival
3
of the unit at the installation site. All necessary piping
1
FWD 14
adjustments can be made at that time
2
3
• Where specified, supply and install valves in the water
1
piping upstream and downstream of the evaporator and
FWD 20
2
condenser, to isolate the heat exchangers for maintenance
3
and to balance/trim the system.
Intake
Table 2 – Installation Responsibility
Measurement conditions:
Measurements taken at the horizontal air intake.
Requirement
Foundation
Fan
Rigging
Unit
speed
1
FWD 08
2
3
Isolation
1
Electrical
FWD 10
2
3
1
FWD 12
2
3
1
FWD 14
2
3
1
FWD 20
2
3
Water piping
Insulation
Water piping connection
components
Caution on exposure to
refrigerant
UNT-PRC002-GB
RLC-SVX023A
Power level in dB(A), per Hz frequency band
125
250
55
50
57
54
58
57
57
51
58
54
60
58
57
51
58
54
60
58
56
62
61
66
63
69
57
63
61
66
63
69
Trane supplied
Trane installed
Power level in dB(A), per Hz frequency band
125
250
56
55
63
62
66
65
62
58
- Circuit breakers or fusible
66
63
disconnects (Optional)
70
67
- Unit mounted starter
62
58
- Wye Delta starter or AFD
66
63
(Adaptive Frequency Drive)
70
67
66
65
73
72
78
76
68
72
76
76
78
79
Insulation
- Grooved pipe
- Grooved pipe to flagged
connection (optional)
• Supply and install flow switches or equivalent devices
in both the chilled water and condenser water piping.
Interlock each switch with the proper pump starter and
Tracer UC800, to ensure that the unit can only operate
when water flow is established.
• Supply and install taps for thermometers and pressure
gauges in the water piping, adjacent to the inlet and outlet
connections of both the evaporator and the condenser.
• Where specified, supply and install strainers ahead of all
pumps and automatic modulating valves.
• Supply and install refrigerant pressure relief piping from
the pressure relief to the atmosphere.
• Start the unit under supervision of a qualified service
technician.
500
1000
2000
42
• Where specified, supply and insulate the evaporator
37
37
47
40
30
and any other portion of the unit, as required, to prevent
50
42
32
sweating under normal operating conditions.
45
42
34
• For unit-mounted starters, cutouts are provided at the top
48
45
38
50
48
40
of the panel for line-side wiring.
45
42
34
• Supply and install the wire terminal lugs to the starter.
48
45
38
50
48
40
• Supply and install field wiring to the line-side lugs of the
50
48
39
starter.
55
53
47
58
56
50
51
49
40
55
53
47
58
56
50
Trane supplied
Field installed
500
1000
2000
55
53
46
60
60
53
63
62
56
Isolation pads
55
58
51
- Flow switches (may be field
60
62
56
supplied)
63
65
59
- Harmonic filters (on request
55
58
51
according to customer electrical
60
62
56
network and equipment)
63
65
59
65
65
57
69
71
64
73
75
69
64
64
56
68
71
65
71
74
69
Flow switches (may be field
supplied)
Unit Description
Overall power
4000
8000
dB(A)
31
30
38
40
40
43
33
28
39
35
42
39
33
28
39
35
42
39
38
36
46
45
50
49
39
37
46
45
50
49
Customer supplied
Customer installed
Meet foundation requirements
Overall power
Safety chains
4000
8000
dB(A)
Clevis connectors
45
42
Lifting beams
53
53
55
57
Other type of isolators
48
44
- Circuit breakers or fusible disconnect
55
52
- Electrical connections to unit mounted
59
57
starter (optional)
48
44
- Electrical connections to remote
55
52
mounted starter (optional)
59
57
- Wiring sizes per submittal and local
50
46
regulations
59
57
- Terminal lugs
64
63
- Ground connections
52
50
- BAS wiring (optional)
61
61
- Control voltage wiring
66
66
- Chilled water pump contactor and
wiring including interlock
- Option relays and wiring
- Taps for thermometers and gauges
- Thermometers
- Strainers (as required)
- Water flow pressure gauges
- Isolation and balancing valves in water
piping
- Vents and drain on waterbox valves
- Pressure relief valves for water side
Insulation
Respect recommendation of IOM
addendum
46
50
53
48
51
54
48
51
54
56
60
63
57
60
63
57
64
67
61
66
69
61
66
69
68
74
78
69
75
78
9 1 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents