Run-Time; On-Time - Hitachi SJ700-2 Series Instruction Manual

Easy-sequence programming software ezsq
Hide thumbs Also See for SJ700-2 Series:
Table of Contents

Advertisement

Variable name
Cumulative

RUN-Time

operation RUN
time monitoring
- Explanation
This variable can be used to monitor the accumulated running time of the inverter. The data monitored
with this variable corresponds to the data monitored by the cumulative operation RUN time monitoring
function (d016). This variable is read-only.
- Sample program: Program to output a one-second pulse signal indicating the running time of the
inverter to a contact output every hour
  :
LOOP
UL(01)=
(01)".
UL(00)=
if
Y(00)=
delay off
LBL1
goto
  :
Variable name
Cumulative

ON-Time

power-on time
monitoring
- Explanation
This variable can be used to monitor the accumulated power-on time of the inverter. The data
monitored with this variable corresponds to the data monitored by the cumulative power-on time
monitoring function (d017). This variable is read-only.
- Sample program: Program to convert the power-on time into a number of days and output the
converted data as word data to Y (00) to Y (05)
UL(00)=
UL(00)=
Yw=
  :
Range of values
0 to 999999
UL(00)
RUN-Time
UL(00) =
UL(01)
1
Y(00)
TD(2)
100
LOOP
Range of values
0 to 999999
ON-Time
UL(00) /
24
UL(00) and
31
Chapter 5 Instruction Words
Default
Unit
-
Hour
: Set the previous data in variable "UL
: Fetch the running-time data.
then
LBL1
: Turn Y (00) on.
: Turn Y (00) off after 1 second elapses.
Default
Unit
-
Hour
: Fetch the power-on time data.
: Convert the data into a number of days.
: Output the data to Yw.
5 - 45
Data size
Attribute
Unsigned
Readable
2-word data
Data size
Attribute
Unsigned
Readable
2-word data

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj700 series

Table of Contents