JMA-9100/7100 Installation Manual > 2.INSTALLATION OF SCANNER UNIT > 2.4 PRECAUTIONS
2.4

PRECAUTIONS

2.4.1

Installation of scanner unit

1)
Precautions for transporting and storing the scanner
An scanner is a heavy load. Be very careful about handling it.
Do not allow the scanner fall on its side while it is stored or being installed.
Do not apply rope to the scanner in the way that squeezes or deforms the radiating
section.
When hoisting the scanner by a crane, do not hoist it by attaching a belt or a rope only
to the scanner's radiating section as shown in Fig 2-11.
For the S-band, attach a rope to the hoisting eyebolts attached to the scanner's chassis,
and then hoist the scanner (Fig 2-12). If a belt or a rope is attached to the scanner's
support section located at the bottom of the radiating section, a load is imposed to the
joint between the radiating section and the chassis.
For the X-band, wrap a cloth around the scanner's support section located at the bottom
of the radiating section, and then attach a belt or rope to it to hoist the scanner (Fig 2-
13).
Fig 2-12:
Fig 2-11:
Improper way to hoist
Attach a rope to the
hoisting eyebolts
S-band
2- 26
Fig 2-13:
X-band