3. Close fryer drain-valve and fill frypot with water to the bottom OIL LEVEL line.
4. Boil out frypot prior to first use. See Frypot Boil-Out instructions in Section 2.4.
5. Drain, clean, and fill frypot(s) with cooking oil. See Section 2.5, Equipment Setup and Shutdown
Procedures.

2.3 Power Requirements

Copper wire suitable for at least 167°F (75°C) MUST be used for power connections.
MODEL
VOLTAGE
17 kW
17 kW
17 kW
17 kW
220/380
17 kW
240/415
17 kW
230/400
21 kW
21 kW
21 kW
21 kW
220/380
21 kW
240/415
21 kW
230/400
The electrical power supply for this appliance MUST be the same as indicated on the rating
and serial number plate located on the inside of the fryer door.
This appliance MUST be connected to the voltage and phase specified on the rating and
serial number plate located inside the fryer door.
All wiring connections for this appliance MUST be made in accordance with the wiring
diagrams furnished with the equipment. Wiring diagrams are located inside the fryer door.
2.4 Frypot Boil Out
Before the fryer is first used for cooking, it should be boiled out to ensure that residue from the
manufacturing process is eliminated.
Also, after the fryer has been in use for a period of time, a hard film of caramelized oil will form
inside the frypot. This film should be periodically removed by following the boil-out procedure.
CHAPTER 2: INSTALLATION INSTRUCTIONS
PHASE
WIRE
SERVICE
208
3
3
240
3
3
480
3
3
3
4
3
4
3
4
208
3
3
240
3
3
480
3
3
3
4
3
4
3
4
4
SERIES ELECTRIC FRYERS
DANGER
MIN.
AWG
SIZE
(mm 2 )
6
(16)
6
(16)
6
(16)
6
(16)
6
(16)
6
(16)
4
(25)
4
(25)
6
(16)
6
(16)
6
(16)
6
(16)
DANGER
DANGER
DANGER
2-5
AMPS PER LEG
L1
L2
L3
48
48
48
41
41
41
21
21
21
26
26
26
24
24
24
25
25
25
58
58
58
51
51
51
25
25
25
32
32
32
29
29
29
30
30
30

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hpre e4 series

Table of Contents