York YCAV0157-0267 Installation Operation & Maintenance page 78

60 hz air-cooled screw liquid chillers (150-260 tons). e/v high efficiency and s/p standard efficiency
Table of Contents

Advertisement

TECHNICAL DATA
DIMENSIONS - YCAV0197E/V High Efficiency English
4"
POWER ENTRY IS ON BOTTOM OF PANEL
7 7/8" (EDGE OF
Notes:
1. Placement on a level surface free of obstructions (including snow, for winter operation) or air recirculation ensures rated performance, reli-
able operation and ease of maintenance. Site restrictions may compromise minimum clearances indicated below, resulting in unpredictable
air flow patterns and possible diminished performance. YORK's unit controls will optimize operation without nuisance high pressure safety
cutout; however, the system designer must consider potential performance degradation. Access to the unit control center assumes the unit
is no higher than on spring isolators. Recommended minimum clearances: side to wall - 6' ; rear to wall - 6'; control panel end to wall - 4'; top
– no obstructions allowed; distance between adjacent units - 10'. No more than one adjacent wall may be higher than the unit.
78
1 1/2"
POWER ENTRY
10" WIDE X 13" HIGH
VIEW B-B
C
B
C
20 5/8"
UNIT TO COOLER
CONNECTION)
CONTROL ENTRY
3" WIDE X 13 1/2" HIGH
1 3/4"
B
88 1/8"
VIEW A-A
FORM 201.21-NM1 (616)
12"
VIEW C-C
LD10532A
JOHNSON CONTROLS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents