Installation (cont'd)
Level Case
Position the case at the highest point. Set a long
magnetized level (4ft [1220 mm] or more) on
either underneath the deck or on top of the case.
Ensure to level case from front to back and side
to side.
Level Adjustment
Use shims at each corner of the case to level
out any discrepancies in order to optimize case
performance and proper drainage.
Level
(4 ft[1220mm])
Level
(4 ft[1220mm])
Note: To avoid removing concrete fl ooring, begin
line up levelling from the highest point of the
store fl oor.
8