2.
Place the PoE shelf in the rack as shown in
Figure 2-7

Front Mounting the PoE Shelf in a Two-post Rack (3-inch Rails)

3.
Attach the PoE shelf to the rack rails using eight customer-supplied rack screws (two screws
for each mounting ear). See
You have completed the installation of the PoE shelf. You can now connect the PoE shelf to the
K-Series chassis and install power supplies in the PoE shelf. See
Supply.

Mid-mounting the PoE Shelf in a Two-post Rack (3-inch Rails)

You must supply four rack screws to complete this installation.
To mid-mount the PoE shelf in a two-post rack with 3-inch rails:
1.
Attach the short rails, included with the K-POE-4BAY-RAIL rail kit
shelf as shown in
Flat washers and pan head screws are included with the K-POE-4BAY-RAIL rail kit for
attaching the rails to the shelf.
Figure
2-7.
Figure
2-8.
Enterasys K-Series K-POE-4BAY PoE Shelf Hardware Installation Guide 2-7
Figure
2-7.
Chapter
Installing the PoE Shelf
3,
Installing a Power
,
to the sides of the PoE

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-poe-4bay

Table of Contents