Installing A K-Series Ac Power Supply In The K-Poe-4Bay Poe Shelf - Enterasys K-Series Installation Manual

Table of Contents

Advertisement

Installing a K-Series AC Power Supply in the K-POE-4BAY PoE Shelf

The front panel should be flush with the face of the K-Series chassis. If significant resistance is
encountered before the front panel is flush, remove and reinsert the power supply. Do not
force the power supply into place.
Figure 3-3
1
Power supply
2
Power supply handle
3
Captive screw
4.
Secure the power supply to the shelf by screwing the captive screws into the shelf.
5.
If you are installing more than one power supply, remove the coverplates from the applicable
number of power supply slots, as shown in
Keep the coverplates in the event you need to remove the power supplies.
3-4 Installing a Power Supply
Caution: Forcing a misaligned power supply into place can damage the power supply and/or the
chassis backplane.
Precaución: Colocar de manera forzada una fuente de poder o no colocarla bien alineada podría
dañarla y/o maltratar el panel posterior del chasis.
Installing a K-Series AC Power Supply in the K-POE-4BAY PoE Shelf
4
Faceplate
5
Power supply slot
Figure
3-4.

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-poe-4bay

Table of Contents