3. Installation
B - Connecting the EBM
1. Plug the EBM power cable(s) into the battery connector(s). Up to 4 EBMs may be connected to the UPS.
2. Verify that the EBM connections are tight and that adequate bend radius and strain relief exist for each
cable.
3. Connect the battery detection cable(s) to the connector of the UPS and of the EBM(s).
3.4

UPS Tower 5-6KVA

A - Checking the accessory kit
Verify that the following additional items are included with the UPS:
1
9SX UPS
2 stabilizing feet
2
RS232 communication cable
3
USB communication cable
4
Safety instructions
5
Quick start
6
Page 16
614-20306-00 - 9SX 0-6 KVA EMEA_EN