Two-Post Rack Installation - Cisco Catalyst 9800-80 Installation Manual

Wireless controller
Table of Contents

Advertisement

Installing the Controller

Two-Post Rack Installation

Before you begin
Warning
Statement 1006—Chassis Warning for Rack-Mounting and Servicing
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to
ensure that the system remains stable.
The following guidelines are provided to ensure your safety:
• This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
• When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the
• If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the
The Cisco Catalyst 9800-80 Wireless Controller can be installed on a two-post rack, either 19 inch or 23 inch.
We recommend that you allow at least 1 or 2 inches (2.54 or 5.08 cm) of vertical clearance between the
controller and any equipment directly above and below it.
Step 1
On the chassis, ensure that all the screw fasteners on the installed components are securely tightened.
Step 2
Make sure that your path to the rack is unobstructed. If the rack is on wheels, ensure that the brakes are engaged or that
the rack is otherwise stabilized
Step 3
(Optional) Install a shelf in the rack to support the Cisco Catalyst 9800-80 Wireless Controller. If you use a shelf, it helps
support the chassis while you secure it to the rack.
If you are using a shelf, place the chassis on the shelf and slightly raise the front of the chassis to align the
Note
mounting bracket holes with the rack post holes while allowing the bottom of the chassis to rest on the shelf.
Step 4
With two people, lift the chassis into position between the rack posts.
Step 5
Align the mounting bracket holes with the rack post holes and attach the chassis to the rack.
Step 6
Position the chassis until the rack-mounting flanges are flush against the mounting rails on the rack.
Tip
To allow space to attach the cable-management brackets to the chassis in the rack easily, use the rack-mount
bracket ear holes mentioned in Steps 7 and 8.
Step 7
Hold the chassis in position against the mounting rails in the equipment rack and follow these steps:
1. Insert the bottom screw into the second hole up from the bottom of the rack-mount ear and use a hand-held screwdriver
to tighten the screw to the rack rail.
Tip
To make installation easier, insert one screw at the bottom of the chassis and the next screw at the top of
the chassis diagonally from the first screw
2. Insert the top screw into the second hole from the top of the rack-mount ear diagonally from the bottom screw and
tighten the screw to the rack rail.
3. Insert the rest of the screws to secure the chassis to the rack equipment.
heaviest component at the bottom of the rack.
unit in the rack.
Cisco Catalyst 9800-80 Wireless Controller Hardware Installation Guide
Two-Post Rack Installation
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents