Clearances
When installing a shelf over the top of the fireplaces, the following
guidelines must be adhered to:
DR3613NI
21"
2"
2.5"
DR3613NI-2
Figure 4. Combustible Wall Clearances
NOTES:
†
Clearance from top of fireplace to a ceiling within the fireplace
enclosure.
††
Clearance to solid sides. Clearance to front framing studs is 1".
Refer to framing drawings.
8
1'' all around
0"
6"
2" on the
horizontal
Section 3: Venting
Montigo offers a variety of direct venting and termination options. The
direct vent termination location MUST be selected such that it is the
highest point in the venting assembly. It should also be selected such
that it provides the shortest vent run possible. Should it be impossible
to ensure that the termination is the highest point or to meet the
venting guidelines laid out below please contact your Montigo dealer
to discuss power venting options.
Notes For Planning Venting:
• Venting originates from the top of the unit
• Venting can terminate through the roof or through an exterior wall.
• Refer to Appendix A - Termination Locations to ensure the planned
termination location is acceptable.
• Once the termination location has been established, refer to the
appropriate section below for installation details
• All fireplaces shipped from the factory are top vent.
• Silicone application is NOT required when joining Montigo vent
pipes and components.
NOTICE
Under no circumstances can Montigo flex venting be cut to
accommodate an installation. Use an alternative length to complete
your vent run.
Installation
XG0226 - 180904