GENERAL
GENERAL
8 LOCATION OF SENSORS
R
7000 ACI PLUS buffer tanks incorporate sockets for temperature control sensors.
9
The actual positioning of sensors depends on what components, water connections and control device are installed.
9
The installer is responsible for making all necessary connections to the boiler and solar collectors. Installers must use their
expertise to ensure proper installation and functioning in compliance with all applicable legislation.
9
Joins between temperature sensor cables and control panel extension cables must be soldered and protected by sheaths or
other forms of electrical insulation.
8