Table Of Contents; Job Specification Sheet - Pentair FLECK 2510 Service Manual

Hide thumbs Also See for FLECK 2510:
Table of Contents

Advertisement

TABLE OF CONTENTS

JOB SPECIFICATION SHEET ...............................................2
INSTALLATION .....................................................................3
START-UP INSTRUCTIONS..................................................3
3200 TIMER SETTING PROCEDURE ....................................4
3210 TIMER SETTING PROCEDURE ....................................4
3200, 3210, 3220, 3230 REGENERATION CYCLE
SETTING PROCEDURE .......................................................5
3200 TIME CLOCK TIMER ASSEMBLY .................................6
3210 METER DELAYED TIMER ASSEMBLY .........................8
2510 SXT VALVE ................................................................. 12
2510 MANUAL VALVE ........................................................ 12
2510 VALVE ACCESSORIES ............................................... 13
2510 VALVE CONVERSION ASSEMBLIES .......................... 14
MANUAL POWERHEAD ASSEMBLY .................................. 18
CONTROL VALVE ASSEMBLY ............................................ 19
METER ASSEMBLY ............................................................ 21
1600 BRINE SYSTEM ASSEMBLY ...................................... 22
1650 BRINE SYSTEM ......................................................... 23
BYPASS VALVE ASSEMBLY (PLASTIC) .............................. 24
BYPASS VALVE ASSEMBLY (METAL) ................................ 25
2300 SAFETY BRINE VALVE .............................................. 26
2310 SAFETY BRINE VALVE .............................................. 27
SEAL & SPACER TOOLS & REPLACEMENT ..................... 29
TROUBLESHOOTING .......................................................... 31
FLOW DATA & INJECTOR DRAW RATES .......................... 32
WIRING ............................................................................... 33
SERVICE ASSEMBLIES ...................................................... 34
CALIFORNIA PROPOSITION 65 WARNING
This product contains chemicals known to the
WARNING:
State of California to cause cancer or birth
defects or other reproductive harm.
2 • FLECK
2510 Service Manual

JOB SPECIFICATION SHEET

Job Number: ______________________________________________
Model Number: ____________________________________________
Water Hardness: __________________________________ ppm or gpg
Capacity Per Unit: __________________________________________
Mineral Tank Size: ___________ Diameter: ________Height: ________
Salt Setting per Regeneration: ________________________________
1. Type of Timer:
A. 7 Day or 12 Day
B. Meter Initiated
2. Downflow:
Upflow
3. Meter Size:
A. 3/4-inch Std Range (125 - 2,100 gallon setting)
B. 3/4-inch Ext Range (625 - 10,625 gallon setting)
C. 1-inch Std Range (310 - 5,270 gallon setting)
D. 1-inch Ext Range (1,150 - 26,350 gallon setting)
E. 1-1/2 inch Std Range (625 - 10,625 gallon setting)
F. 1-1/2 inch Ext Range (3,125 - 53,125 gallon setting)
G. 2-inch Std Range (1,250 - 21,250 gallon setting)
H. 2-inch Ext Range (6,250 - 106,250 gallon setting)
I. 3-inch Std Range (3,750 - 63,750 gallon setting)
J. 3-inch Ext Range (18,750 - 318,750 gallon setting)
K. Electronic ____Pulse Count ___ Meter Size ____________
4. System Type:
A. System #4: 1 Tank, 1 Meter, Immediate, or Delayed Regeneration
B. System #4: Time Clock
C. System #4: Twin Tank
D. System #5: 2-5 Tanks, Interlock Mechanical
2-4 Tanks, Interlock Electronic
Meter per unit for Mechanical and Electronic
E. System #6: 2-5 Tanks, 1 Meter, Series Regeneration, Mechanical
2-4 Tanks, 1 Meter, Series Regeneration, Electronic
F. System #7: 2-5 Tanks, 1 Meter, Alternating Regeneration,
Mechanical
2 Tanks only, 1 Meter, Alternating Regeneration, Electronic
G. System #9: Electronic Only, 2-4 Tanks, Meter per Valve, Alternating
H. System #14: Electronic Only, 2-4 Tanks, Meter per Valve. Brings
units on and offline based on flow.
5. Timer Program Settings:
A. Backwash: ______________________________ Minutes
B. Brine and Slow Rinse:_____________________ Minutes
C. Rapid Rinse: ____________________________ Minutes
D. Brine Tank Refill: ________________________ Minutes
E. Pause Time: ____________________________ Minutes
F. Second Backwash: _______________________ Minutes
6. Drain Line Flow Control: ______________________gpm
7. Brine Line Flow Controller: ____________________gpm
8. Injector Size#: _____________________________
9. Piston Type:
A. Hard Water Bypass
B. No Hard Water Bypass
Upflow Variable

Advertisement

Table of Contents
loading

Table of Contents