Dell Z9100-ON Installation Manual page 21

Open networking
Hide thumbs Also See for Z9100-ON:
Table of Contents

Advertisement

Figure 9. Attaching the Switch Rails
2.
After you have installed both switch rails, line them up on the previously mounted ReadyRails and
slide the switch in until it is flush with front of rack. About three inches before you fully insert your
system, the rail locking feature engages to keep the switch from inadvertently sliding out of the rack
and falling.
Figure 10. Front Rack Installation
Install the Z9100–ON
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents